ACETry ACE ↗
← Back

PLET 323Packaging Processes

3 credits · Plastics Engineering Technology -​ BC · Penn State

In-depth studies and laboratory experiments will be conducted on processes such as blow molding, thermoforming, extrusion, and rotational molding, and other packaging processes. PLET 323 Packaging Processes (3) In this course the student will learn about plastic packaging processes of blow molding, thermoforming, extrusion. Other minor processes will be presented. The course objectives are to develop student proficiencies in identifying the polymer material requirements for each process, in identifying the mold design and construction techniques for each process, and knowing how plastic packaging processes differ from injection molding. The laboratory will include experiments that show the advantages of each process and to develop student competency in running equipment for each process explored. The students shall also develop competency in conducting elementary process troubleshooting for each process. Student competency is assessed by graded lab reports and projects.

Before you enroll

Prerequisites

From the catalog: “PLET 227 and PLET 304 Enforced Concurrent at Enrollment: PLET 350 and MET 418”

Where it fits

Where it sits in degree plans

Suggested plans most often put it in Year 4 · Fall (1 program).

Required in (1)

  • Plastics Engineering Technology, B.S.
What it opens up

Courses that list PLET 323 as a prerequisite (1)